Manufacturing & fabrication

Find the material shortage before the order reaches the floor

Production starts, then stops for a missing component. EVOR checks the released bill of materials against stock, raises a purchase request for the shortage and keeps a quality check between production and finished stock.

Explore the workflow
  • BOMs released by a second person
  • A shortage raises a purchase request — once
  • Quality check before finished stock
Engineers working on a factory floor
EVOR production order with product, quantity and stage rail
Production order — real EVOR screen with demo data

Manufacturing & fabrication

Where production gets blocked

1 / 3

Build from the approved version of the BOM

In the working dayThe workshop cuts to last month’s drawing because the BOM was edited in place.

What EVOR lets you do
BOMs are versioned. The person who prepares a BOM cannot release it, and a released BOM cannot be edited.
Why it matters
Production orders always use a checked, fixed recipe.
Bill of materials — released version
Proof: Bill of materials — released version · real EVOR screen, demo data

What to look at

  1. Draft → Submitted → Released
  2. Version and release date

2 / 3

Surface the shortage before production starts

In the working daySteel runs out halfway through an order; purchasing hears about it from the floor.

What EVOR lets you do
Releasing a production order plans materials from the BOM. A shortage raises one purchase request; materials are issued to the order once.
Why it matters
Purchasing sees the gap when it can still act, and stock movements are not duplicated.
Production order — materials, operations, quality and cost
Proof: Production order — materials, operations, quality and cost · real EVOR screen, demo data

What to look at

  1. Required, issued and available
  2. Actual cost from materials and labour

3 / 3

Pass quality before stock is finished

In the working dayBatches reach the warehouse before anyone checks them.

What EVOR lets you do
A quality inspection needs every operation recorded; the operator who produced the batch cannot inspect it; passed plus failed must equal the inspected quantity.
Why it matters
Finished stock has passed an independent check you can trace.
Quality inspection — passed and failed
Proof: Quality inspection — passed and failed · real EVOR screen, demo data

What to look at

  1. Linked production order
  2. Passed / failed and notes

Example workflow

Follow one production order

Illustrative example with fictional names. Each step is a real EVOR action.

Record status

  1. BOM released
  2. Released
  3. In progress
  4. QC passed
  5. Completed

Engineer · BOM released

Connected on the same record

Also connected

  • Purchasing

    Purchase requests, approved POs and goods receipts.

  • Lots and expiry

    Batch tracking for materials that expire.

  • Stock ledger

    Every movement kept, reversals included.

  • Make-to-order

    Production orders linked to the customer they serve.

Roles

What each person works with

Planner
Orders to release, shortages and planned dates.
Operator
Their production orders and the operations to record.
Quality inspector
Batches waiting for inspection and the checklist.

Compare

One order, two ways of working

Many teams run well on spreadsheets and chat. The difference is where the information ends up.

StepTypical disconnected processIn EVOR
RecipeEdited spreadsheet.Released, locked BOM version.
ShortageFound on the floor.Purchase request raised on release.
QualityChecked if there is time.Independent inspection before finished stock.

What to compare before choosing any system

Approvals and roles

Can you set who approves quotations, discounts, variations and refunds — and limit what each role sees?

EVOR: Approval rules per workspace; roles with own, team, branch or all-records scope.

Mobile and offline scope

Which tasks work on a phone, and exactly which of them work without signal?

EVOR: The EVOR web app runs in the phone browser. Ask us to show the field workflow you need on a phone during the demo.

Customer portal

Can your customers raise requests and follow status without calling you?

EVOR: A configurable customer portal for requests, status and documents.

Documents and localisation

Do quotations and invoices carry your branding, TRN and 5% VAT the way your customers expect?

EVOR: PDF quotations, tax invoices, job cards, receipts and POs with TRN and VAT.

Migration and onboarding

How do your existing customers, sites and products get in, and who sets up the workflow?

EVOR: CSV import with preview for customers, contacts, sites, products, leads and suppliers.

Total cost for your configuration

What will you pay for your number of office users, field users and branches — including add-ons?

EVOR: Plans list their modules and user limits on the pricing page; we quote your configuration in writing.

Getting started

What happens when you ask for a demo

  1. We get in touch

    A product specialist contacts you by the method you chose to agree a time and hear how your team works today.

  2. Your industry demo

    We show EVOR with your industry template and a workflow like yours — not a generic tour.

  3. Trial workspace

    If it fits, you get a 14-day trial workspace with the template installed. Customers, sites and products can be imported from CSV.

  4. Set up and go live

    Roles, approval rules, numbering and documents are configured with you before your team starts.

FAQ

Questions manufacturing & fabrication teams ask

Is EVOR an MRP or MES system?

EVOR covers BOMs, production orders, material issue, quality checks and finished-goods costing connected to stock and purchasing. It does not run machine scheduling or shop-floor data capture from machines.

Can a released BOM be changed?

No. You prepare a new version; only one version is prepared at a time.

What happens if an order is cancelled?

Cancelling a running order returns issued materials once.

How is the product costed?

Costing comes from issued materials and recorded operations on the order.

What should we bring to the demo?

One product with its bill of materials and routing.

Your industry demo

See one of your products in EVOR

Tell us how to reach you. We will set up its BOM and a production order in the demo.

Request your demo

For Manufacturing & fabrication. Four fields — the rest is optional.

How should we contact you?

Include the country code, e.g. +971 50 123 4567

Add details (optional)

Your details are used to arrange your demo.

Book my industry demo

For Manufacturing & fabrication. Four fields — the rest is optional.

How should we contact you?

Include the country code, e.g. +971 50 123 4567

Add details (optional)

Your details are used to arrange your demo.