EVOR for manufacturing

See what production needs next.

Material availability, production progress and quality checks should inform the next decision.

Explore the workflow
Material shortage → PR raised Quality check passed

PO-MFG-0142

Steel cabinets · 120 units

BOM v3 (released) · Line 2

In production
  • MaterialsIssued once(done)
  • ShortagePR raised(needs attention)
  • QualityBatch 1 passed(done)
  • NextFinished goods(next step)

Demo data · summary of an EVOR record

Manufacturing

Where production decisions are made blind

Problem 01

Material shortages discovered late

  • With EVOR: Shortage raises a purchase request
  • Benefit: Purchasing knows in time

Problem 02

Unclear production status

  • With EVOR: Production order on a released BOM
  • Benefit: Status from the order

Problem 03

Quality findings separated from production

  • With EVOR: Independent quality check per batch
  • Benefit: Results stay with the batch

Explore the workflow

One production order, from order to finished goods

Select a stage to see the record. Real EVOR screens, demo data.

Stage 1 of 5

Order

Planner

Creates the production order from a released BOM version.

Record statusPlanned

  1. Order — current
  2. Materials
  3. Production
  4. Quality
  5. Finished goods
EVOR order screen: Creates the production order from a released BOM version.
Real EVOR screen · demo data

Stage 2 of 5

Materials

Store

Issues materials once; shortages raise a purchase request.

Record statusMaterials issued

  1. Order — done
  2. Materials — current
  3. Production
  4. Quality
  5. Finished goods
EVOR materials screen: Issues materials once; shortages raise a purchase request.
Real EVOR screen · demo data

Stage 3 of 5

Production

Supervisor

Records operations and cost on the order.

Record statusIn production

  1. Order — done
  2. Materials — done
  3. Production — current
  4. Quality
  5. Finished goods
EVOR production screen: Records operations and cost on the order.
Real EVOR screen · demo data

Stage 4 of 5

Quality

Inspector

Inspects the batch — not the person who produced it.

Record statusPassed

  1. Order — done
  2. Materials — done
  3. Production — done
  4. Quality — current
  5. Finished goods
EVOR quality screen: Inspects the batch — not the person who produced it.
Real EVOR screen · demo data

Stage 5 of 5

Finished goods

Store

Receives finished goods into stock.

Record statusIn stock

  1. Order — done
  2. Materials — done
  3. Production — done
  4. Quality — done
  5. Finished goods — current

Finished goods

In stock

Store

Demo data · summary of an EVOR record

Features

From BOM to finished goods, connected

  • Purchasing

    Purchase requests, approved POs and goods receipts.

  • Lots and expiry

    Batch tracking for materials that expire.

  • Stock ledger

    Every movement kept, reversals included.

  • Make-to-order

    Production orders linked to the customer they serve.

What planners, the store and quality see

  • Planner

    Orders to release, shortages and planned dates.

  • Operator

    Their production orders and the operations to record.

  • Quality inspector

    Batches waiting for inspection and the checklist.

Compare

Spreadsheets and chat, or one connected record

StepSpreadsheets & chatIn EVOR
RecipeEdited spreadsheet. Released, locked BOM version.
ShortageFound on the floor. Purchase request raised on release.
QualityChecked if there is time. Independent inspection before finished stock.

Getting started

From demo request to go-live

  1. We get in touch

    By email, phone or WhatsApp — your choice.

  2. Your industry demo

    Shown with a workflow like yours.

  3. 14-day trial

    With your industry template installed.

  4. Go live

    Roles, approvals and documents set up with you.

FAQ

Frequently asked questions

Is EVOR an MRP or MES system?

EVOR covers BOMs, production orders, material issue, quality checks and finished-goods costing connected to stock and purchasing. It does not run machine scheduling or shop-floor data capture from machines.

Can a released BOM be changed?

No. You prepare a new version; only one version is prepared at a time.

What happens if an order is cancelled?

Cancelling a running order returns issued materials once.

How is the product costed?

Costing comes from issued materials and recorded operations on the order.

What should we bring to the demo?

One product with its bill of materials and routing.

Your industry demo

Bring one product. See its production in EVOR.

Tell us how to reach you. We set up the demo around work like yours.

Request your demo

For Manufacturing. Four fields — the rest is optional.

How should we contact you?

Include the country code, e.g. +971 50 123 4567

Add details (optional)

Your details are used to arrange your demo.

Book my industry demo

For Manufacturing. Four fields — the rest is optional.

How should we contact you?

Include the country code, e.g. +971 50 123 4567

Add details (optional)

Your details are used to arrange your demo.